Operational excellence in construction, industry and infrastructure
From root cause analysis to an improvement that is part of day-to-day operations, measured before and after
An operational excellence programme starts with the facts: where time, money and quality are lost in your processes, and why. In the case of an incident or a recurring failure, we look for the cause using the TOP-SET method. Targeted improvements with Lean and Six Sigma methods follow, carried by the people who do the work. The result is measured in output, lead time and costs, and the team takes over the improvement itself.
Who it is for
Companies with a concrete operation that could do better: a production unit, a construction site, a project organisation or a warehouse where time, money or quality is being lost and nobody can say exactly where.
Management teams that want measurable results after a strategic choice. The course is set; now lead time, costs and quality must follow. If the course itself is still the question, it starts with management consultancy.
Organisations with a recurring incident or quality problem that want to find and remove the cause, not just the symptom.
How it works
- Diagnostic review. We join the operation, talk to the people who do the work, and measure what happens: lead times, downtime, errors, costs. Where data is available, we start there; where it is missing, we map it.
- Root cause analysis. The causes behind the figures, separated from the symptoms, and a list of improvements ranked by impact and feasibility. For an incident, using TOP-SET: facts, timeline, causes, measures.
- Improving. For each improvement a small team, a clear owner and a measurable target. Lean tools where flow is the issue, Six Sigma where variation is the issue, plain common sense where that is enough.
- Embedding. Standards, visual management, reporting that the management team actually reads, and training for supervisors and managers so the improvement stays after we have left.
- Measuring and letting go. The same measurement as at the start, together with the team. Only when the figures hold and the team runs it themselves do we wrap up.
Fields of application
Construction
On construction sites the issues are planning, rework, waiting times between crews and subcontractors, and information that reaches the right person too late. For several international contractors we have made projects lean and set up a PMO.
Infrastructure
We know large port, canal and road projects in Australia, Panama, the United Arab Emirates, Singapore and Belgium from the inside. On a large road infrastructure project we spent almost two years on risk and opportunity management within the project organisation: quarterly reporting to the project management board, recalibration of risk provisions, cost control linked to risk management, an early warning procedure towards the client, workshops and new KPIs, in line with ISO 31000.
Logistics
In warehousing, transport and the supply chain we start from the data your systems already record. The full approach, with process mining and a KPI structure, is set out under logistics management.
What you can expect from us
Someone who knows operations. We have ourselves taken a production unit to a higher level, started up warehouses and made projects lean. We know how a shift change goes, what downtime costs and why a fine procedure is not followed.
Figures, not opinions. Every improvement rests on a measurement you can check yourself. OPEX and CAPEX savings are calculated, not promised.
Improvements that last. An improvement that depends on our presence is no improvement. We build the measurement and the standard into day-to-day operations. Where the resistance is greater than the process, we support that as change management and coaching.
Costs
Hourly or daily rate, excluding VAT, with an estimate per phase at the outset. For a diagnostic review we agree a fixed number of days; for the improvement programme a rhythm, for example two days a week, with an evaluation point after each phase. No success fees; the result is yours.
Standards and methods
- Lean and Six Sigma (DMAIC): the methodology for process improvement and variation control; Black Belt certification.
- Kelvin TOP-SET: structured incident and root cause investigation; Senior Investigator.
- ISO 31000: risk management, applied to risk and opportunity management on large projects.
An improvement that exists only on paper is no improvement. We measure before and after, and we only let go once the team runs it themselves.
ir. Ben Verlinden
Questions about operational excellence
Which methods do you use?
Lean and Six Sigma for process improvement and variation control, with a Black Belt certification. Kelvin TOP-SET for incident and root cause investigation. Risk and opportunity management to ISO 31000 and cost control for projects. The method follows the problem, not the other way round.
How do you measure results?
With a baseline measurement before the start and the same measurement afterwards: output per shift, lead time, first-time-right, OPEX and CAPEX, availability of installations. We agree in advance which figures count and who keeps track of them, so the result is yours and not ours.
Do you also carry out incident and root cause investigations?
Yes. In the case of an incident, a failure or a quality problem, we carry out a structured root cause investigation using the TOP-SET method: gathering facts, building a timeline, distinguishing causes from symptoms, and measures that prevent recurrence. The same discipline as in a technical expert investigation, applied before there is a dispute.
How does this differ from logistics management?
It is not a different firm or a different method. Logistics management is this approach applied to warehousing, transport and the supply chain, with system data and process mining as the starting point. This page sets out the approach for construction and infrastructure.
Related
Discuss your case
A first conversation is free of obligation. Book a time straight away, or send us your question through the form.
Last updated: